Comments, Easier Subtask Management, and New Interface Customization Options!
14.7.0
2026.11.05
Current version
  • Task comments are here! Discuss details and leave important notes directly in the task card. Available on paid plans.
  • Smart task parameter recognition. Enter dates, times, projects, and tags directly in the task title — the app will automatically fill in the corresponding fields. Create new projects and tags as you type, and customize the symbols used to quickly add them.
  • Flexible task parameter customization. Hide unnecessary parameters, rearrange them, or choose from presets in Settings → Interface → Task Parameters.
  • In three-panel mode, manage subtasks directly from the parent task card: add new ones, open existing ones, and navigate back to the parent task.
  • Make more room for your task list in three-panel mode: collapse the right panel and expand it again whenever you need it.
  • Plus, we’ve made lots of small improvements to make the app even more convenient to use:)

P. S. Singularity is closer than you think!

AI Assistant 2.1 and a New System Tray and Menu Bar Widget
14.6.0
2026.10.29
  • AI Assistant now remembers your preferences and takes them into account across all chats. Memory is stored only on your device. Manage it in Settings → AI Assistant → Memory.
  • Control the app through AI Assistant: open sections, days, and tasks, switch project views, enable sorting, find settings, start timers, or create smart filters.
  • In the desktop app, click the icon in the system tray or menu bar to open the widget.
  • Use the widget to view notifications and your weekly plan, check off habits, or dictate new tasks.
  • Customize the widget and choose which tabs to display and in what order under Settings → Tray & Menu Bar.

P. S. Singularity is closer than you think!

Launch at startup
14.5.0
2026.10.26
  • Enable launch at startup so the app starts together with your computer: Settings → General settings → Launch at startup.
  • Task dates now include an abbreviated weekday name, e.g. «Mon, October 26».
  • We also made many small improvements and fixes that make the app even more pleasant to use.

P. S. Singularity is closer than you think!

Big release! Voice input, AI Assistant 2.0 and full-screen tasks
14.4.0
2026.10.16

Voice input

  • Dictate tasks with the microphone button or Alt+Shift+D. SingularityApp splits your speech into separate tasks and recognizes dates, times, repeats, priority and other details.
  • Edit tasks by voice: for example, «move to Friday» or «add bread to the checklist».
  • Choose how speech is recognized: your own OpenAI key, models on your device (desktop app) or browser recognition (web version).

AI Assistant 2.0

  • Faster and smarter.
  • Works with files: text, images, PDFs, and other formats. It can summarize a file or create tasks from it using your own OpenAI or Anthropic API key.
  • Asks clarifying questions and suggests answer options.
  • Connect your own OpenAI or Anthropic key, or a local model via Ollama.
  • Voice input and AI Assistant are available on the Elite plan and during the trial.

Task editor

  • In Calendar, Kanban and three-pane mode, the task’s path is now shown. Hover over it to go to the parent task, section or project.
  • In Calendar and Kanban, the task window can be expanded to full screen, with text centered or full width.

P. S. Singularity is closer than you think!

Stopwatch and Timer Statistics!
14.3.0
2026.10.06
  • In the timer window, switch to the Stopwatch tab to work on a task in a continuous flow without breaks. Stop the stopwatch to log the time spent.
  • Click the statistics icon in the bottom-left corner of the timer window to view Pomodoro and stopwatch stats for the selected period.
  • Pause both Pomodoro and the stopwatch with a single button — we’ve added this option.
  • We also added nice animations for the menu icons ;-)

P. S. Singularity is closer than you think!

Edit task titles directly in the list and update multiple tasks at once
14.2.0
2026.10.02
  • In three-panel mode, you can now edit a task title directly in the list: click the title, and the cursor will appear exactly where you clicked. Use the ↑/↓ arrow keys to move between neighboring tasks.
  • Select multiple tasks using Shift or Cmd/Ctrl, and their shared parameters will appear in the right-hand panel. You can change the date, deadline, project, priority, and reminder for all selected tasks at once.
  • [beta] If you want to reduce RAM usage, you can enable the experimental memory optimization feature in Settings → Backup → Optimize memory.

P. S. Singularity is closer than you think!

Recognizing Parameters from the Task Name
14.1.0
2026.09.29
  • You can enter the date, project, tag, and priority directly in the task name. For example: «Buy milk tomorrow @Home #groceries» — the task fields will be filled in automatically.
  • You can configure or disable recognition here: Settings → Quick Task Add

P. S. Singularity is closer than you think!

Separate Task Panel and Redesigned Task Window!
14.0.1
2026.09.22
  • Task details can now be opened in a panel on the right, next to the task list. Enable the three-panel layout using the icon in the top toolbar.
  • We redesigned the task window: priority, date, deadline, and other settings are now grouped into a compact row of chips. Click a chip to change its value, or click the cross to clear it. You can customize the row: click «+» on the right and pin the parameters you use most often — separately for notes and tasks.

P. S. Singularity is closer than you think!

13.1.1
2026.09.16

We brought the singularity a couple more quanta closer. Stability and performance have been improved.

P. S. Singularity is closer than you think

Hide weekends in Calendar and choose custom colors for projects and tags!
13.1.0
2026.09.03
  • You can now hide weekends in the Calendar — the option is available in the menu.
  • You can choose any color from the palette for projects and tags. To change a project color: open the project → click the icon to the left of the project name. To change a tag color, use the tag menu.
  • Fixed the counter in Today and recurring task settings.

P. S. Singularity is closer than you think!

Table of Contents and Moving Elements in Task Descriptions
13.0.1
2026.08.27
  • Task, note, and project descriptions now have a table of contents, so you can jump to any heading with a single click. You can turn off the table of contents under Settings → General Settings.
  • You can now easily rearrange text, lists, and other elements in descriptions. Just use the drag handle to the left of an element.
  • We’ve reduced the app’s RAM usage.

P. S. Singularity is closer than you think!

Configuring bright colors in Calendar
12.9.1
2026.08.24

Added a setting to enable bright colors on the Calendar tab, independent of the app’s theme: Settings → Themes → Bright colors in Calendar.

Turn it on if you prefer bright, high-contrast colors.

P. S. Singularity is closer than you think!

Beauty in the Calendar and updated Settings!
12.9.0
2026.08.17
  • In the Calendar, we refreshed the styling and the shades of tasks and events: now all colors adapt to different themes, with softer contrast that’s easier on the eyes. We made it convenient, stylish, and beautiful:-)
  • In Settings, we completely revamped the Account and sync tab, making it easier to manage your data and subscription.
  • Added a handy search to navigate through Settings.
  • Updated the Themes section — added interface scale control.
  • Added new sections: Quick task creation, Backup, and About.
  • Redesigned the sign-in and sign-up windows.

P. S. Singularity is closer than you think!

Productivity email digests!
12.8.0
2026.08.14

We’ve added daily emails with a summary of your productivity: tasks, habits, Pomodoro — a short reminder to help you stay focused.

  • Settings → General → Task summary by email. Choose when you want to receive the emails — or turn digests off entirely.
  • You can also unsubscribe by clicking the «Unsubscribe» button in the email.
  • You can turn digests back on anytime.

P. S. Singularity is closer than you think!

Planning Calendar!
12.7.0
2026.08.03
  • Open the Planning Calendar using the button in the app’s top toolbar to manage your schedule in a dedicated panel.
  • Drag tasks from the list to the calendar to schedule them for a specific date and time — and drag them back if needed.
  • Adjust a task’s duration directly in the calendar panel by stretching or shrinking it.
  • The Planning Calendar is available on all paid plans.

P. S. Singularity is closer than you think!

Markdown in Notes, Code Blocks, and Search in Any Keyboard Layout!
12.6.0
2026.07.28
  • The task and project description editor now supports Markdown: bold text, italics, #headings, and *lists are formatted as you type. When you paste text with Markdown formatting, it is applied automatically.
  • Added a «Copy as Markdown» button to the text formatting toolbar.
  • When exporting to CSV, task descriptions are now saved in Markdown format.
  • You can now add code blocks with syntax highlighting to task and project descriptions.
  • Search now works even when text is entered using the wrong keyboard layout.

P. S. Singularity is closer than you think!

Spell Check and the Beta Version of the AI Assistant!
12.5.0
2026.07.20
  • We’ve added spell check: misspelled words are now underlined as you type. If your system supports correction suggestions, right-click a misspelled word to see the available alternatives.
  • The AI assistant is now available in beta. To enable it, go to Settings → Al Assistant. Please read the details carefully before connecting it.

P. S. Singularity is closer than you think!

Updated Sorting & Project Tree Collapse
12.4.3
2026.07.13
  • Added two new options to the project menu. «Expand All» fully expands sections, tasks, and nested projects on the project page. In the left sidebar, it expands the entire project tree. «Collapse All» does the opposite.
  • Improved «Smart» sorting and «Sort by Time»: tasks with a scheduled time are now displayed above tasks without a time.

P. S. Singularity is closer than you think!

Strikethrough Text and App Optimizations!
12.4.2
2026.06.29
  • We’ve added strikethrough text to task and project descriptions. Turn it on using the text formatting toolbar or a keyboard shortcut: ⌘ + Shift + X on macOS, Alt + Shift + 5 on Windows and Linux.
  • We’ve sped up search, task archive performance, and app startup.
  • We’ve fixed an issue with opening files through local links on macOS.

P. S. Singularity is closer than you think!

Flexible Date Filter and Other Improvements!
12.4.1
2026.06.17
  • Updated the filter: now you can flexibly filter by task creation date, due date, deadline, and start date.
  • Made many small improvements: list view mode for the calendar, sorting assignees alphabetically on the «Filter» page, and more. We also fixed a possible error that could occur when starting the app.

P. S. Singularity is closer than you think!